Frost still in the ground this morning, bunker building still carried on at the 2 nd fairway. In the afternoon we managed to dig out a few more bunkers. Even though the turf at the nursery was slightly frozen, we managed to put a few loads of revetting on trailers and workmans. At the end of the day, instead of putting the trailers in the tractor shed we put them in the main building. Hopefully the turf will thaw out with the heat of the building.
Today we also had guys at the 17th and 9th holes doing a spot of gorse pruning.