18/05/2012

Friday 18th May 2012

Another good start to the week weather wise. Not warm but dry.

Another application of top dressing was applied to the greens.

Greens cut behind and rolled.

The 3rd green was overseeded before we top dressed

using the Greentek Dyna Seeders
The rest of the week there was not much growth so it was a case of either cutting or rolling.

Selective weed killing was started around the course.

Dangerous was up to his tricks cleaning out the sheds not with a brush but a blower!!
Stoor everywhere.

Down at the 18th, we have had a problem with a leaking pipe that goes across the burn alongside the bridge. We had to take concrete sleepers off to get to the pipe. Pipework repairs carried out by Callum Chalmers and our very own Dunc, as Gus our irrigation engineer is off after having an operation.

Also this week we had a visit from Richard Windows from the S.T.R.I
Here we have Sandy, The Godfather and Richard all conducting different tests on the greens.