09/05/2011

Monday 9th May




The calm after the storm. I'll start off with an apology, i did n't wish for that much rain, honestly!!




Over the weekend we had just under 50mm of rain, this was enough to close the Burnside on the Sunday morning.







Today, greens were hand cut and rolled. Holes changed, bunkers raked and tee markers moved.







Fairway were also cut.







A good few bunkers have water in them from the rain and this was another job for the guys to tackle today.



Sad news at the weekend was the death of Seve Ballesteros.


Seve, started his dream of playing in The Open in 1975 at Carnoustie and in 2007 he was back to where it had started to announce his retirement.



Me with Seve at 1999 Open.


http://en.wikipedia.org/wiki/Seve_Ballesteros

06/05/2011

Thursday 6th May



Well, the rain we hoped for arrived last night.



Back to yesterday, hand watering on the course on-going, fairways cut and greens rolled.





Dry weather allowed us to mini core weak areas around greens.





These areas were then applied with fescue seed, seaweed and rubber crumb. The application is then raked in using an old style bunker rake and rolled behind.
The rubber crumb acts like a cushion as it settles round the crown of the plant and drops into the tine holes. This relief of compaction and reduced surface hardness not only saves the grass but helps in keeping walk off areas strong and playable.




http://www.tebbuttassociates.co.uk/crown3.html





Our seasonal staff for this year are :



Garry, Kevin and Michael (who is here for only 6 weeks).





Today, 1st and 11th greens were pencil tined and sprayed with a liquid soil catalyst. These are two of the weaker greens.





Greens hand cut at 4.25mm.



This weekend is the turn of Carnoustie and Dalhousie Golf Clubs for their Spring Meetings.



http://www.carnoustiegolfclub.com/



http://www.dalhousie.co.uk/





George looking for litter!!!





Big marquee at the Caledonia Golf Club, who are hosting a wedding for the first time today.


Forgot to mention last week that all the greenkeepers wish Caddymaster Martin Roy a speedy recovery. I am sure he will be back with us in no time at all.



04/05/2011

Wednesday 4th May


Another week of glorious weather so far.



On Monday, i had a chance to have a look how building work was getting on in the new Pro Centre. Above the main entrance.



Left - Pro Shop Right - Main receptoion area.



Out on the course greens were hand cut Monday/Wednesday(today) at 4.25mm and rolled yesterday with the Graden rollers.



A few boys were out hand watering around the greens and newly turfed areas.



A start was made to weed-killing fairways.







Sandy stimping the greens.


http://www.biggacentralsection.org.uk/articles/The%20Stimpmeter%20isn't%20Everything.pdf


Good article.



This morning, a touch of frost halted things for a short spell.




Once the frost lifted holes were changed, greens cut,



tees cut



and walkways were fed with an organic based compound fertiliser.


Rain forecast for the next two days.



01/05/2011

Sunday 1st May


This weekend brings the first of the spring meetings ( Caledonia, Mercantile and New Taymouth Clubs) and my first weekend rota of the summer season.


Greens were cut on Saturday and rolled today.



At the weekend we also move the tee positions and rake all the bunkers.


Websites for clubs below:


http://www.carnoustiecaledonia.co.uk/


The New Taymouth Club also run from the Caledonia clubhouse now.


http://www.carnoustie-mercantile.co.uk/

28/04/2011

Thursday 28th April



What a rare spell of weather we are having right now, is it wrong to hope for a day of rain!!





This week greens were brushed and double cut ahead of homemade feedmix being applied.





Homemade mix which included dried blood, hoof and horn, sulphate of ammonia and sulphate of iron was put out by hand and switched in after it was spread.










Oops, how did that photo get in there?



Hopefully, Dunfermline will secure the league this weekend.





Swans making a nest at the 11th tee.





Very heavy dew every morning this week so we have been out with the dewies before we cut.





There was even a touch of frost this week.






Semi rough being cut and feathering around the course took place.







Fairway and Rough Technicians (F.A.R.T) take care of the divot damage,




after the fairways are cut.







The tea hut is nearer completion.





After the feed this week, we have been cutting with the boxes off to ensure that any feed thats on the surface is put back in.







What is Dangerous Jimmy up to now another invention!!












Another busy week in the workshop, playing hide and seek and fixing ladies buggies.



John (MBE) has been away for most of the week as he is taking part in The Royal Wedding, he has been keeping a video diary and sent up footage of the dress rehersal.



Enjoy!






http://youtu.be/Kav0FEhtLug