26/03/2012

Monday 26th March 2012


Last week of the winter course this week. The forecast is looking very good temperature wise.

Over the past few weeks we have busy coring, top dressing and getting ready for the new season.


New turf at the 17th fairway midi tined, brushed up and top dressed. The same procedure (with rubber crumb added in) applied to new turf areas, walk off areas and any weak areas.

The Hydroject has been out on walkways and fairway bumps.

A homemade special mix was made up for the greens and approaches and put out.


Irrigation up and running. Sprinklers here and there being raised up.

We have created a new turf nursery area at the 3rd,4th,5th triangle.


This area will be a nursery for fairway turf.

Elsewhere, coastal defences are being improved by Angus Council in a bid to stop further erosion.

Mechanics are busy installing safety barriers around the shed.


The Imlay Bridge at the 10th is opened by John Imlay and former Chairman Gordon Murray.

16/03/2012

Friday 16th March 2012


LINKS SUPERINTENDENT’S REPORT FOR FEBRUARY 2012


WEATHER

February was a fine month with a predominantly westerly airflow mainly light to fresh and only 8 overnight frosts all in the first 2 weeks of the month. Average noon temperatures were a little up on normal at 7.5 ° C and rainfall was low with a total of only 20mm for the month. Burnside and Buddon Courses were closed on the 5th, 6th and 9th of the month due to ice over frozen ground.

WORK ON THE LINKS



CHAMPIONSHIP COURSE

Drainage

The drainage installation at the start of the 7th fairway was completed early in the month.


Burn Wall Raising – 10th Approach

The burn wall adjacent to the 11th tee to fairway walk-way was raised by two kerbs to match the 10th approach side of the burn. Turfing to the wall was completed following sand infill.



Turf Repairs

 Some “heads” were required on the 3rd green approach and divot scars were similarly repaired on landing areas at the 1st, 3rd and 7th holes. The section of access road running in front of the 10th tee was turfed over as was the track in the gorse to the left of the 5th hole.



Mounding - Left Of 10th Walkway

Following final sand cover this separation mounding from the 3rd green Burnside was turfed over with fescue turf.



Aeration

Greens were slit-tined followed by rolling whilst the new turf laid on the 7th fairway was mini-tined, top-dressed and rolled.



Mowing

Greens were brushed, cut and rolled twice during the month while green approaches and winter greens were mown once. Tees were mown as required and roughs were brushed.

Bunkers

Grow covers were removed from bunker faces during the month and sand topping-up progressed on re-built bunkers. The two bunkers at the 9th greenside were filled with the trial sand mixtures as agreed.

Top-Dressing

Fairway sand top-up dressing was carried out in the second half of the month with certain fairways receiving an additional dressing.

Hand Watering

The unusually dry weather for February resulted in the need for hand-watering on re-turfed areas generally.

Bridge Repairs

Ditch crossing bridges on the 2nd, 5th and 6th holes were repaired as required.

Turf Conditioner Treatment

Granular wetting agent and seaweed was applied to bunker faces and tops along with repair patches and “heads” as required.

Ditch Bases

Gravel was used as a ditch base covering to suit new levels on the 2nd, 3rd and 5th holes.

Spring Fertiliser

Tees were dressed with a mixture of ammonium sulphate, iron sulphate and seaweed. This lawn sand mix was applied to higher parts on fairways and around the 16th green. A 4-6-8 organic based fertiliser was used on trafficked tees, bridges, approaches and new turf on the 3rd and 18th fairways.



BURNSIDE COURSE

14th Tee

Turfing was completed at the beginning of the month on this re-modelled teeing area and irrigation control valves and boxes installed accordingly. A line of MP rotator sprinklers were installed on the green walk-off towards the tee at this time.

Aeration

Greens were solid-tined with 8mm pencil tines during the month while verti-drain aeration included certain walkways and fairways using ½ ̎ solid tines.

Bunker Revetments

Bunker revetments during the month included



One on the 2nd green approach

One at the left hand side 3rd green

One on the left hand side 4th fairway

One on the right hand side 12th fairway

Irrigation

The irrigation installation running to the right of the 17th green, adjacent to the 17th green on the Championship Course, was updated with new smaller sprinklers with restricted throw to suit this narrow separation strip of turf. The two remaining bore hole meter chambers were constructed on the 5th and 17th holes.

Top-Dressing

All fairways were top-dressed with our own screened dune sand followed by brushing-in as usual.

Mowing

Greens, green surrounds and teeing grounds were cut during the month as well as the new turf on the fairway. Greens were rolled on several occasions.

3rd Green – Rear Right Repair

The flood prone dip to the right rear of this green was raised following silty top-soil removal and suitable sandy replacement. The coarse turf to the base of the adjacent mound was replaced also.



BUDDON LINKS COURSE

Mounding – 5th Greenside

This mounding was re-shaped before turfing over with fescue turf in the first half of the month.

Turf Repairs

Turf repairs included turfing along the walkway edge of the previous sand extraction area in front of the 18th tee and the irrigation track on the practice tee where pipework and sprinklers were re-adjusted following the Huxley Tee Turf installation.

Mowing

Greens and winter greens were cut and rolled during the month.

Aeration

The main aeration work during the month was the verti-draining on greens using 8mm pencil tines, followed as usual by rolling. Par 3 walkways were verti-drained also.

Bunker Maintenance

Bunker maintenance involved the usual blowing of faces and general tidying in conjunction with topping-up with a bunker sand mixture from our sand supplier H. King – Kilwinning.

Ditch Work

The main focus during the month along with environmental work in the early part of the month was ditch excavation and associated pipework.
The ditch track was excavated at the 8th hole running alongside the 8th green and on to meet the ditch next to the service road at the corner of the practice tee. The first 50 metres or so was piped using 300mm reinforced pipe backfilled and turfed over. The remaining section was left as open ditch and the side walls were turfed over with turf revetments formed where necessary. This work proved to provide a much better outlet to the ditch running alongside the railway than the alternative going under the service road near the gas sub-station.
The ditch behind the practice tee and either side of the gas sub-station was cleared out to appropriate base levels.
The pipe running under the service road at the 12th green walk off was lowered to suit lowered ditch level and two concrete pipes were installed at the ditch crossing close to the 6th tees leading into The Championship Course.



ENVIRONMENTAL WORK

Further routine environmental work was carried out in the first 10 days of the month due to the frosty conditions.
Gorse was coppiced on the 1st, 8th, 11th, 12th and 17th holes on The Championship Course, the 6th, 8th, 12th and 15th holes on The Burnside Course and the 6th, 13th, 8th and 11th holes on The Buddon Course.
Broom was strimmed back on the 14th hole of the Burnside Course and round the Buddon Course generally.
14 dead trees were removed from the 6/7/16 triangle on The Burnside Course as was the overhanging limb to the rear of the 13th tee. Blown trees on the 6th and 11th holes of The Buddon Course were cut-up and all arisings were chipped at the skip site close to the western boundary.
The spoil heap was tidied up and suitable access road re-established alongside.
The chipping site opposite the 13th tee on The Buddon Course was cleared and planted-up and this chipping site relocated to the sand storage area near the spoil heap.
Log stacks were placed at the 7th hole.
All bird boxes were cleaned out early in the month.





John S. Philp

Links Superintendent 

29/02/2012

Wednesday 29th February 2012


Not long until the start of the season now.
Been a while since my last post so here is a run down off what we have been up to.




Dangerman Jimmy has been out re designing grass heaps for the new golfing year.





At the 10th, more sand was driven in, the area was shaped, tramped and raked and ready for turf.

Back at the base, the tractor shed was getting a facelift. New panels replacing the faded and bashed(probably Jimmy) ones.

Turf arrived from Inturf.

Areas turfed at the 11th wall,

and down at the trackway


and mounding at the 10th.

Ditch work is still on-going, digging out the gravel/silt and replacing with fresh gravel.

With the mild winter there was not so much heading out divots on fairways this year.
Landing areas at the 3rd, 5th and 7th were given a quick check.


An old road was removed and returfed at the 5th.


We have two different types of bunker sand trialing at the moment on the 9th approach.
The bunkers on the Championship course are all filled with Tay sand which was dredged from the River Tay near Perth. This proccess was stopped nearly 15 years ago now and we are coming close to using up our remaining stock piles. 

You know its nearly the start of the season when you start shaping bunkers.


All fairways top-dressed using just over 200 tonnes of washed dune sand.

Astroturf matting trimmed up.

Mechanics are busy as usual getting all the units ready for the new season.

13/02/2012

Monday 13th February 2012


Frustrating weather last week.
Sandy (above) saluting the Queen's Jubilee.


The ground was solid with frost, then things did nt help with the rain.
Gorse maintenance was on the cards for most of the week.


Mobile gorse bushes.


Rain on top of the frost causing course closures.


Plenty of gorse chipping to get on with.


Dangerous Jimmy sorting the road at the dump.


I think the rake on the back window is for safety!!



Ditch being dug out to the left of the 2nd tee.

Handyman Barry washing the Links Espace.


Dangerman was a busy man last week.


Bridge replacements at the 3rd and one at the 5th.


Here he is again getting the Hardi Boss sprayer out of the back of the shed. We are looking to sell this on as we no longer use it.


One of the PowerRangers out for a run.

07/02/2012

Tuesday 7th February 2012

Hard frost this week so far, closing the Burnside and Buddon (icy parts on fairways).
The focus the last two days has been on gorse management.


Back to last week, an area of burn bank was dug out at the 11th.


Another two rows of kerb were laid. This week we will drive in some sand upfill and get the area ready for turf.


More sand being driven into the job at the 10th walkway.

Another few days of driving will hopefully see this area filled up and ready for turf. 



A load of turf for the 14th Burnside tee arrived and the Championship team helped roll out the excess at the nursery.


Ditch work continues around the course.


Two new drains installed at the start of 7th fairway.


Hopefully they work.